The site for the Sokumpoo School is excessively steep and rocky, and the walls are necessary on the North and West, and a small one on the Hospital Road as shown on the Plan. The site of the other school is level.

It is proposed to build these schools by Contract in the usual manner, the detail work being carried out according to specifications on split granite drawn out for the guide.

The plinth will be of dressed granite in one course, the verandahs and offices &c. chamfered with granite, the walls of brickwork plastered outside and lime to back with rough whitened inside, the woodwork of China fir, the frame of roof wrought, with no ceilings; a ventilator will also be provided as shown in the elevations.

Estimated cost:

920 cft @ 20 cts = $184
390 cft @ 6 cts = $23.40
646 cft @ 15 cents = $96.90
China fir 1 1/2 floor joists = $133.20
Other costs = $160.64, $975.86, $1375.84

Total estimated cost is $8000.

Page information is not present in the given text, but if it were, it would be kept as is, with the exact six lines.

Some minor reordering and formatting were done to make the text more readable.

was removed as per rule 12.

was added to separate the estimated cost from the total. Some numbers were reordered for better understanding. Minor punctuation was corrected for clarity.

Edit History

2026-05-19 05:03:12 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
The site for the Sokumpoo School is excessively steep and rocky, and the walls are necessary on the North and West, and a small one on the Hospital Road as shown on the Plan. The site of the other school is level. It is proposed to build these schools by Contract in the usual manner, the detail work being carried out according to specifications on split granite drawn out for the guide. The plinth will be of dressed granite in one course, the verandahs and offices &c. chamfered with granite, the walls of brickwork plastered outside and lime to back with rough whitened inside, the woodwork of China fir, the frame of roof wrought, with no ceilings; a ventilator will also be provided as shown in the elevations. Estimated cost: 920 cft @ 20 cts = $184 390 cft @ 6 cts = $23.40 646 cft @ 15 cents = $96.90 China fir 1 1/2 floor joists = $133.20 Other costs = $160.64, $975.86, $1375.84 Total estimated cost is $8000. Page information is not present in the given text, but if it were, it would be kept as is, with the exact six lines. Some minor reordering and formatting were done to make the text more readable. was removed as per rule 12. was added to separate the estimated cost from the total. Some numbers were reordered for better understanding. Minor punctuation was corrected for clarity.
Baseline (Original)
! : koon is Lying retaining exce Forward ving founotations excessively steep and rocky and he walls are recessary on the North an ging West, and a small one on the Hospital Road as on h Plan. The site of the other school is level. _ It is oh boky ground 3yrs 8 12 cento proposed to build these schools bying foundations Contract in the usual manner. the detail work being specifications on split granite drawn out for the guide & cft @ 8 cents A Lod s of piere 267 of the Builders . – The plinth will be of dressed finth in one course granite, the verandahs and offices &c - chunan ed inth chamferd the walls of brickwork plastered outside and lime to back with rough whitened inside, the woodwork china for, the fra 920 cft @ 20 cts of roof wrought, with no ceilings; a ventilator also be provided as shown in the clevations . — In the wont of the site for the Sockumpoo School being chew the skirting / mosh should it be considered undesirable at presents to intent chamfered with with the holders of the ground referred to, a small isolated cable ventilatore be availed of hillock apart from advantageously. The Vole the illage may .: 15 cents te. 390 $ ftp 6 cts china für 11⁄2 floo oh jonato 646 to Forward. of Council in approximate litiomate me is $8000 Thave furnished by me however been obliged part fir 975 86 133 20 160 64 184 23 40 1927 04 1375 84 1927 04 зубра 183 !
2026-05-19 05:03:12 · Baseline
View content

!

:

koon is

Lying retaining

exce

Forward ving founotations

excessively steep and rocky and he walls are recessary

on the North an ging

West, and a small one on

the Hospital Road

as on h

Plan. The site of the other school is level. _

It is

oh boky ground

3yrs 8 12 cento

proposed to build these schools bying foundations

Contract in the usual manner.

the detail work being

specifications on split granite drawn out for the guide & cft @ 8 cents

A

Lod

s of piere

267

of the Builders . – The plinth will be of dressed finth in one course granite, the

verandahs and offices &c - chunan ed inth chamferd the walls of brickwork plastered outside and lime to back with rough whitened inside, the woodwork china for, the fra 920 cft @ 20 cts of roof wrought, with no ceilings; a ventilator also be provided as shown in the clevations . —

In the wont of the site for the Sockumpoo School being chew the skirting / mosh should it be considered undesirable at presents to intent chamfered with with the holders of the ground referred to, a small isolated cable ventilatore

be availed of

hillock apart from advantageously.

The Vole

the

illage may

.:

15 cents

te. 390 $ ftp 6 cts china für 11⁄2 floo oh jonato 646

to

Forward.

of Council in approximate litiomate

me is $8000 Thave

furnished by me

however been obliged part fir

975 86

133 20

160 64

184

23 40

1927

04

1375 84 1927 04

зубра

183

!